← ALL PROJECTS
NATIONAL RETAIL CHAIN
·2024
·LOW VOLTAGE
Multi-Site Rollout
Rolled out structured cabling, security, and POS infrastructure across 28 store locations on a coordinated schedule.
Twenty-eight stores. One schedule. No dark openings.
Structured cabling, cameras, and POS drops were prefabricated and staged so each site could be cut over in a night. Chicagoland was the hub; the same playbook traveled.