Skip to content
← ALL PROJECTS
NATIONAL RETAIL CHAIN ·2024 ·LOW VOLTAGE

Multi-Site Rollout

Rolled out structured cabling, security, and POS infrastructure across 28 store locations on a coordinated schedule.

Multi-Site Rollout

Twenty-eight stores. One schedule. No dark openings.

Structured cabling, cameras, and POS drops were prefabricated and staged so each site could be cut over in a night. Chicagoland was the hub; the same playbook traveled.